BC is moving ahead with permanent repairs to a key highway damaged by catastrophic flooding last November.
The province is aiming to design and complete the repairs at three of the seven damaged bridges along the Coquihalla Highway.
Construction is slated for the summer, with completion by the end of the year to return the highway to four lanes along a section between its summit and 50 kilometres south of Merritt